Caso de Estudio de ESTRUCTURAS ALTAS

Skanska

Field Erection OF (2) 275FT tall HRSG Stacks

680MW Natural Gas Fueled Combined-Cycle Electric Generation

CPV Valley Energy Center is a 680MW natural gas-fueled combined cycle electric generation facility in Wawayanda, New York, USA. Our responsibilities included the field erection of two (2) 275’ tall HRSG stacks which were built in the wintertime under extremely cold and snowy conditions. The plates were shipped to the site in 90 degree sections and welded in the field. As typical of many gas plant sites, cooperation with other contractors was key to coordinate daily work tasks due to space limitations and lack of available work area. Once construction is completed in 2018 it will become one of New York’s cleanest natural gas facilities. The plant will produce enough electricity to power more than 650,000 homes.

Datos del proyecto


Nombre del proyecto:
CPV Valley Energy Center

Ubicación:
Condado de Orange, Nueva York, EE. UU.

Instalación:
Montaje en campo de dos (2) chimeneas para HRSG de 84 m de altura

Finalización:
2017