Solamat Merex secondary combustion chamber replacement

proyecto detalle

This industrial Incineration plant is located in Fos sur mer, in the south of France near Marseille. The scope of this project was to remove the old cylindrical Post-Combustion and build a new one with a new design.

proyecto detalle

The project included the construction of all the steel structure and the refractory lining. First the structure was assembled on a special area in the site. Then it was set up with a special truck.

Characteristics:

  • 21 meters tall
  • 7 meters large
  • 1 side of 5 meters large and 9 sides of 1.5 meters
  • Thickness of the refractory lining: 230mm

Project Data


Technology
Refractory & Steel Work (design, manufacturing and erection)

Project Name:
Secondary Combustion Chamber Replacement

Location:
Fos sur Mer, France

Customer Name:
Solamat Merex

Owner Name:
Sarpi Veolia