Industry

Applied Engineering. Electrical Installations in High and Low Voltage. Process Automation with PLC and SCADA. HVAC Installations. All of them adapted to the particular environment, from the most dangerous to the most neutral.

  • Pharma
  • Chemical
  • Food
  • Sugar
  • Automotive
  • Electrical Substations

INDUSTRY MAIN PROJECTS

Imagen de fondo del proyecto
logo Proyecto

PHARMA

  • CUSTOMER:

Almirall

  • LOCATION:

Sant Celoni (Spain)

  • PROJECT:

Hydrogenator Instrumentation and Control System, based on Wonderware SCADA and Siemens PLC’s.

  • INSTALLATION:

Electrical installation, instrumentation and control system. 

  • COMPLETION:

2014

Imagen de fondo del proyecto
logo Proyecto

CHEMICAL

  • CUSTOMER:

KAO Corporation

  • LOCATION:

Barbera del Valles and Olesa de Montserrat (Spain) 

  • PROJECT:

Four new toner production lines in Barberà del Vallès.

New production plant of ethylene oxide in Olesa de Montserrat with Simatic Batch.

  • INSTALLATION:

Electrical installation, instrumentation, control system and electromechanical maintenance.

  • COMPLETION:

2008

Imagen de fondo del proyecto
logo Proyecto

FOOD

  • CUSTOMER:

DAMM

  • LOCATION:

El Prat de Llobregat (Spain)

  • PROJECT:

Control of automatic loading docks

  • INSTALLATION:

Control and monitoring system of automatic loading docks with Siemens technology in the side of PLC's and Wonderware in the side of SCADA.

Electrical power cabinets.

Tanks refrigeration system.

  • COMPLETION:

2014

Imagen de fondo del proyecto
logo Proyecto

SUGAR

  • CUSTOMER:

Pantaleon Group

  • LOCATION:

Monte Rosa (Nicaragua)

  • PROJECT:

Process Control System of the facility.

  • INSTALLATION:

Control System using DOMINION’s object libraries for both, PLC’s and SCADA software.

  • COMPLETION:

2014

Imagen de fondo del proyecto
logo Proyecto

AUTOMOTIVE

  • CUSTOMER:

Volkswagen AG

  • LOCATION:

Navarra (Spain)

  • PROJECT:

Tailgate and hood lines electrical integration

  • INSTALLATION:

Electric automation engineering, control cabinets engineering and supply, robots and PLCs programming, on-site erection, start-up and production optimization and supervision.

  • COMPLETION:

2017

Imagen de fondo del proyecto
logo Proyecto

ELECTRICAL SUBSTATIONS

  • CUSTOMER:

Lersa

  • LOCATION:

Ripoll (Girona, Spain)

  • PROJECT:

132kV-25kV Substation

  • INSTALLATION:

Global project of the new 132kV Substation. Total Installed Power: 2x30MVA.

  • COMPLETION:

2012